Write us
I read agreement Personal data protection And I understood *
Required field
Form successfuly sent
{common::1::formErrorSent}
Availability
StatusNumber quantityDate of expedition
In stockihneď info
Expedition in same date
Stock in MaterialStock in Material 2-3 days info
Needed manufucturing
To check availability for larger quantities than we currently have in stock nás prosím kontaktujte. For information on quantity and delivery date, nás prosím kontaktujte.
Category
Brands
    Blog
      Products
      No products found

      Load capacity calculation

      The difference between the tested conditions and the real conditions is taken into account by the safety factor. The value of the safety factor can only be determined by a person (designer) who knows the working conditions of the wheels as well as the relevant STN. RENOST consulting can only recommend the value of the factor based on the available information, without guarantee.
      Požadovaná nosnosť sa stanoví nasledovne:
      N=
      V+O
      n
      .β
      Own weight of transport device
      kg
      Maximum load weight
      kg
      Number of scroll wheels and wheels used
      ks
      Safety faktor
      Carrying capacity
      kg
      It determines the deviations of standardized conditions (STN EN 12 527, 12 532) from real ones, which ensure the surface, speed of the device, height of thresholds, slope of slopes, uniformity of load distribution, direction of movement of the roller and wheel, temperature (+15 °C to +28 °C).
      β = 1,3 - 1,5 manual handling in standard conditions, flat cast floor, occasional handling
      β = 1,6 - 3,9 manual handling in adverse conditions - sloping exits, uneven elevator entrances, uneven floors, car exit ramps, frequent handling
      β = 4,0 a viac for machine-towed equipment in continuous operation, generally demanding conditions, not for powered applications

      –⁠
      –⁠
      4043-674f_cpc-g160_hz-160
      Price on demand
      673F CPC-G125 HZ
      Catalogue code: H771402
      Production 8-14 days
      Price on demand
      4048-image - 2024-06-10t091026.672
      Price on demand
      673F CPC-G150
      Catalogue code: H770938
      Production 8-14 days
      Price on demand
      4051-image - 2024-06-10t093121.343
      Price on demand
      673F CPC-G150 H1
      Catalogue code: H701004
      Production 8-14 days
      Price on demand
      4052-image - 2024-06-10t091026.672
      673F CPC-G160
      Catalogue code: H700254
      Production 8-14 days
      Production 8-14 days
      671 Kč without VAT
      4054-image - 2024-06-10t093121.343
      Price on demand
      673F CPC-G160 H1
      Catalogue code: H701005
      Production 8-14 days
      Price on demand
      4061-image - 2024-06-10t091026.672
      Price on demand
      673F CPC-G200
      Catalogue code: H770939
      Production 8-14 days
      Price on demand
      4063-image - 2024-06-10t093121.343
      Price on demand
      673F CPC-G200 H1
      Catalogue code: H701006
      Production 8-14 days
      Price on demand
      4071-image - 2024-06-10t091026.672
      Price on demand
      673F CPC-K125
      Catalogue code: H700307
      Production 8-14 days
      Price on demand
      4073-image - 2024-06-10t093121.343
      Price on demand
      673F CPC-K125 H1
      Catalogue code: H701007
      Production 8-14 days
      Price on demand
      4088-674f_cpc-g160_hl~1
      Price on demand
      673F CPC-K125 HL
      Catalogue code: H700463
      Production 8-14 days
      Price on demand
      4089-674f_cpc-g160_hz-160~1
      Price on demand
      673F CPC-K125 HZ
      Catalogue code: H771401
      Production 8-14 days
      Price on demand
      4090-image - 2024-06-10t091026.672
      673F CPC-K160
      Catalogue code: H700299
      Production 8-14 days
      Production 8-14 days
      534 Kč without VAT
      Do you want to write us sth about our products or e-shop? Do not hesitate to write us.
      Message sent

      Basket contains not allowed items

      Basket is empty