Write us
I read agreement Personal data protection And I understood *
Required field
Form successfuly sent
{common::1::formErrorSent}
Availability
StatusNumber quantityDate of expedition
In stockihneď info
Expedition in same date
Stock in MaterialStock in Material 2-3 days info
Needed manufucturing
To check availability for larger quantities than we currently have in stock nás prosím kontaktujte. For information on quantity and delivery date, nás prosím kontaktujte.
Category
Brands
    Blog
      Products
      No products found

      Load capacity calculation

      The difference between the tested conditions and the real conditions is taken into account by the safety factor. The value of the safety factor can only be determined by a person (designer) who knows the working conditions of the wheels as well as the relevant STN. RENOST consulting can only recommend the value of the factor based on the available information, without guarantee.
      Požadovaná nosnosť sa stanoví nasledovne:
      N=
      V+O
      n
      .β
      Own weight of transport device
      kg
      Maximum load weight
      kg
      Number of scroll wheels and wheels used
      ks
      Safety faktor
      Carrying capacity
      kg
      It determines the deviations of standardized conditions (STN EN 12 527, 12 532) from real ones, which ensure the surface, speed of the device, height of thresholds, slope of slopes, uniformity of load distribution, direction of movement of the roller and wheel, temperature (+15 °C to +28 °C).
      β = 1,3 - 1,5 manual handling in standard conditions, flat cast floor, occasional handling
      β = 1,6 - 3,9 manual handling in adverse conditions - sloping exits, uneven elevator entrances, uneven floors, car exit ramps, frequent handling
      β = 4,0 a viac for machine-towed equipment in continuous operation, generally demanding conditions, not for powered applications

      –⁠
      –⁠
      3854-634_cpc-k160~2
      634 CPC-K160
      Catalogue code: H6341021
      In stock in material 100+ ks info
      Needed manufucturing
      In stock in material 100+ ks info
      Needed manufucturing
      323 Kč without VAT
      634 CPC-K160 AS
      Catalogue code: H720278
      In stock in material 20+ ks info
      Needed manufucturing
      In stock in material 20+ ks info
      Needed manufucturing
      538 Kč without VAT
      634 CPC-K160 BR
      Catalogue code: H720735
      Production 8-14 days
      Production 8-14 days
      323 Kč without VAT
      3856-634_cpc-k160~4
      634 CPC-K200
      Catalogue code: H634104
      In stock 20+ ks info
      Expedition in same date
      In stock 20+ ks info
      Expedition in same date
      382 Kč without VAT
      Price on demand
      634 CPC-K200 AS
      Catalogue code: H771381
      Production 8-14 days
      Price on demand
      Price on demand
      634 CPC-K200 BR
      Catalogue code: H720737
      Production 8-14 days
      Price on demand
      3912-634t_cpc-k160~4
      Price on demand
      634P CPC-G125
      Catalogue code: H771391
      Production 8-14 days
      Price on demand
      3874-634t_cpc-k160~1
      Price on demand
      634P CPC-G150
      Catalogue code: H771392
      Production 8-14 days
      Price on demand
      3913-634t_cpc-k160~5
      634P CPC-G160
      Catalogue code: H87828
      Production 8-14 days
      Production 8-14 days
      522 Kč without VAT
      3914-634t_cpc-k160~6
      634P CPC-G200
      Catalogue code: H634125
      Production 8-14 days
      Production 8-14 days
      568 Kč without VAT
      3872-634t_cpc-k160
      Price on demand
      634P CPC-K125
      Catalogue code: H771389
      Production 8-14 days
      Price on demand
      3875-634t_cpc-k160~2
      Price on demand
      634P CPC-K160
      Catalogue code: H771390
      Production 8-14 days
      Price on demand
      3877-634t_cpc-k160~3
      634P CPC-K200
      Catalogue code: H6341042
      Production 8-14 days
      Production 8-14 days
      539 Kč without VAT
      3918-image - 2024-06-10t083609.339
      653 CPC-G125
      Catalogue code: H624502
      Production 8-14 days
      Production 8-14 days
      338 Kč without VAT
      3810-image - 2024-06-10t083609.339
      653 CPC-G150
      Catalogue code: H700217
      In stock in material 16 ks info
      Needed manufucturing
      In stock in material 16 ks info
      Needed manufucturing
      405 Kč without VAT
      3812-image - 2024-06-10t083609.339
      653 CPC-G160
      Catalogue code: H700218
      In stock in material 16 ks info
      Needed manufucturing
      In stock in material 16 ks info
      Needed manufucturing
      430 Kč without VAT
      3814-image - 2024-06-10t083609.339
      Price on demand
      653 CPC-G200
      Catalogue code: H700220
      In stock in material 20+ ks info
      Needed manufucturing
      Price on demand
      3808-image - 2024-06-10t083609.339
      653 CPC-K125
      Catalogue code: H6245022
      Production 8-14 days
      Production 8-14 days
      284 Kč without VAT
      3811-image - 2024-06-10t083609.339
      653 CPC-K160
      Catalogue code: H6245021
      In stock in material 16 ks info
      Needed manufucturing
      In stock in material 16 ks info
      Needed manufucturing
      343 Kč without VAT
      3813-image - 2024-06-10t083609.339
      Price on demand
      653 CPC-K200
      Catalogue code: H700216
      In stock in material 20+ ks info
      Needed manufucturing
      Price on demand
      3922-image - 2024-06-10t084428.745
      653F CPC-G125
      Catalogue code: H700350
      Production 8-14 days
      Production 8-14 days
      404 Kč without VAT
      3817-image - 2024-06-10t084428.745
      653F CPC-G150
      Catalogue code: H700172
      Production 8-14 days
      Production 8-14 days
      481 Kč without VAT
      3819-image - 2024-06-10t084428.745
      653F CPC-G160
      Catalogue code: H700173
      In stock 2 ks info
      Expedition in same date
      In stock 2 ks info
      Expedition in same date
      504 Kč without VAT
      3821-image - 2024-06-10t084428.745
      Price on demand
      653F CPC-G200
      Catalogue code: H700175
      Production 8-14 days
      Price on demand
      3815-image - 2024-06-10t084428.745
      Price on demand
      653F CPC-K125
      Catalogue code: H700306
      Production 8-14 days
      Price on demand
      3818-image - 2024-06-10t084428.745
      Price on demand
      653F CPC-K160
      Catalogue code: H700176
      Production 8-14 days
      Price on demand
      3820-image - 2024-06-10t084428.745
      Price on demand
      653F CPC-K200
      Catalogue code: H700177
      Production 8-14 days
      Price on demand
      3928-image - 2024-06-10t085047.307
      673 CPC-G125
      Catalogue code: H770900
      Production 8-14 days
      Production 8-14 days
      458 Kč without VAT
      Price on demand
      673 CPC-G125 H1
      Catalogue code: H700993
      Production 8-14 days
      Price on demand
      3930-674_cpc-g160_hl
      673 CPC-G125 HL
      Catalogue code: H770129
      Production 8-14 days
      Production 8-14 days
      653 Kč without VAT
      3931-674_cpc-g160_hz-160
      Price on demand
      673 CPC-G125 HZ
      Catalogue code: H771394
      Production 8-14 days
      Price on demand
      3932-image - 2024-06-10t085047.307
      Price on demand
      673 CPC-G150
      Catalogue code: H770933
      Production 8-14 days
      Price on demand
      3933-image - 2024-06-10t092355.763
      Price on demand
      673 CPC-G150 H1
      Catalogue code: H700994
      Production 8-14 days
      Price on demand
      3934-image - 2024-06-10t085047.307
      Price on demand
      673 CPC-G160
      Catalogue code: H770934
      Production 8-14 days
      Price on demand
      3935-image - 2024-06-10t092355.763
      Price on demand
      673 CPC-G160 H1
      Catalogue code: H700995
      Production 8-14 days
      Price on demand
      3957-image - 2024-06-10t085047.307
      Price on demand
      673 CPC-G200
      Catalogue code: H770935
      Production 8-14 days
      Price on demand
      3958-image - 2024-06-10t092355.763
      Price on demand
      673 CPC-G200 H1
      Catalogue code: H700996
      Production 8-14 days
      Price on demand
      3959-image - 2024-06-10t085047.307
      673 CPC-K125
      Catalogue code: H720196
      Production 8-14 days
      Production 8-14 days
      395 Kč without VAT
      4005-image - 2024-06-10t092355.763
      Price on demand
      673 CPC-K125 H1
      Catalogue code: H700997
      Production 8-14 days
      Price on demand
      4006-674_cpc-g160_hl~1
      673 CPC-K125 HL
      Catalogue code: H720198
      Production 8-14 days
      Production 8-14 days
      577 Kč without VAT
      4007-674_cpc-g160_hz-160~1
      Price on demand
      673 CPC-K125 HZ
      Catalogue code: H771393
      Production 8-14 days
      Price on demand
      4008-image - 2024-06-10t085047.307
      673 CPC-K160
      Catalogue code: H700298
      Production 8-14 days
      Production 8-14 days
      461 Kč without VAT
      4010-image - 2024-06-10t092355.763
      Price on demand
      673 CPC-K160 H1
      Catalogue code: H700998
      Production 8-14 days
      Price on demand
      4017-image - 2024-06-10t085047.307
      673 CPC-K200
      Catalogue code: H700300
      Production 8-14 days
      Production 8-14 days
      512 Kč without VAT
      4020-image - 2024-06-10t092355.763
      Price on demand
      673 CPC-K200 H1
      Catalogue code: H700999
      Production 8-14 days
      Price on demand
      4035-image - 2024-06-10t091026.672
      673F CPC-G125
      Catalogue code: H770936
      Production 8-14 days
      Production 8-14 days
      516 Kč without VAT
      4038-image - 2024-06-10t093121.343
      Price on demand
      673F CPC-G125 H1
      Catalogue code: H701003
      Production 8-14 days
      Price on demand
      4041-674f_cpc-g160_hl
      673F CPC-G125 HL
      Catalogue code: H710209
      Production 8-14 days
      Production 8-14 days
      724 Kč without VAT
      4043-674f_cpc-g160_hz-160
      Price on demand
      673F CPC-G125 HZ
      Catalogue code: H771402
      Production 8-14 days
      Price on demand
      4048-image - 2024-06-10t091026.672
      Price on demand
      673F CPC-G150
      Catalogue code: H770938
      Production 8-14 days
      Price on demand
      4051-image - 2024-06-10t093121.343
      Price on demand
      673F CPC-G150 H1
      Catalogue code: H701004
      Production 8-14 days
      Price on demand
      4052-image - 2024-06-10t091026.672
      673F CPC-G160
      Catalogue code: H700254
      Production 8-14 days
      Production 8-14 days
      671 Kč without VAT
      4054-image - 2024-06-10t093121.343
      Price on demand
      673F CPC-G160 H1
      Catalogue code: H701005
      Production 8-14 days
      Price on demand
      4061-image - 2024-06-10t091026.672
      Price on demand
      673F CPC-G200
      Catalogue code: H770939
      Production 8-14 days
      Price on demand
      4063-image - 2024-06-10t093121.343
      Price on demand
      673F CPC-G200 H1
      Catalogue code: H701006
      Production 8-14 days
      Price on demand
      4071-image - 2024-06-10t091026.672
      Price on demand
      673F CPC-K125
      Catalogue code: H700307
      Production 8-14 days
      Price on demand
      4073-image - 2024-06-10t093121.343
      Price on demand
      673F CPC-K125 H1
      Catalogue code: H701007
      Production 8-14 days
      Price on demand
      4088-674f_cpc-g160_hl~1
      Price on demand
      673F CPC-K125 HL
      Catalogue code: H700463
      Production 8-14 days
      Price on demand
      4089-674f_cpc-g160_hz-160~1
      Price on demand
      673F CPC-K125 HZ
      Catalogue code: H771401
      Production 8-14 days
      Price on demand
      4090-image - 2024-06-10t091026.672
      673F CPC-K160
      Catalogue code: H700299
      Production 8-14 days
      Production 8-14 days
      534 Kč without VAT
      4107-image - 2024-06-10t093121.343
      Price on demand
      673F CPC-K160 H1
      Catalogue code: H701008
      Production 8-14 days
      Price on demand
      4109-image - 2024-06-10t091026.672
      673F CPC-K200
      Catalogue code: H700301
      Production 8-14 days
      Production 8-14 days
      588 Kč without VAT
      4110-image - 2024-06-10t093121.343
      Price on demand
      673F CPC-K200 H1
      Catalogue code: H701009
      Production 8-14 days
      Price on demand
      4111-674_cpc-g160_hl~2
      Price on demand
      674 CPC-G125 HL
      Catalogue code: H324024
      Production 8-14 days
      Price on demand
      4112-674_cpc-g160_hz-160~2
      Price on demand
      674 CPC-G125 HZ
      Catalogue code: H701010
      Production 8-14 days
      Price on demand
      4113-674_cpc-g160_hl~3
      674 CPC-G150 HL
      Catalogue code: H7701010
      In stock 2 ks info
      Expedition in same date
      In stock 2 ks info
      Expedition in same date
      703 Kč without VAT
      4114-674_cpc-g160_hz-160~3
      Price on demand
      674 CPC-G150 HZ
      Catalogue code: H771396
      Production 8-14 days
      Price on demand
      4115-674_cpc-g160_hl~4
      674 CPC-G160 HL
      Catalogue code: H16162
      Production 8-14 days
      Production 8-14 days
      465 Kč without VAT
      4116-674_cpc-g160_hz-160~4
      Price on demand
      674 CPC-G160 HZ
      Catalogue code: H771398
      Production 8-14 days
      Price on demand
      4117-674_cpc-g160_hl~5
      674 CPC-G200 HL
      Catalogue code: H7701082
      In stock in material 5 ks info
      Needed manufucturing
      In stock in material 5 ks info
      Needed manufucturing
      764 Kč without VAT
      4118-674_cpc-g160_hz-160~5
      Price on demand
      674 CPC-G200 HZ
      Catalogue code: H771400
      Production 8-14 days
      Price on demand
      4119-674_cpc-g160_hl~6
      674 CPC-K160 HL
      Catalogue code: H770103
      Production 8-14 days
      Production 8-14 days
      714 Kč without VAT
       
      Loading...
      Load more
      Do you want to write us sth about our products or e-shop? Do not hesitate to write us.
      Message sent

      Basket contains not allowed items

      Basket is empty